Wiring and power supply for 10 ceiling-mounted air conditioners in office spaces
<p>Careful <strong>cabling of ceiling-mounted air conditioners</strong> in a suspended ceiling ensures a <strong>reliable power supply</strong> to the offices, reduces breakdowns and prevents overloads caused by undersized circuits.</p>
<p>In this package, the electrician specialised in HVAC systems provides:</p>
<ul>
<li><strong>Preparation</strong> of the cable routes in the suspended ceiling to supply <strong>10 indoor units</strong>.</li>
<li><strong>Pulling</strong> of power cables from the distribution board to each unit, with clear circuit labelling.</li>
<li><strong>Creation</strong> of dedicated circuits (typically <strong>2 to 3 circuits</strong>) according to the total installed load.</li>
<li><strong>Connection</strong> of the air conditioners to junction boxes or intermediate panels in the ceiling void.</li>
<li><strong>Installation</strong> of suitable protections: breakers, RCDs and terminal blocks.</li>
<li><strong>Testing</strong> of the electrical installation, continuity checks and step-by-step energising.</li>
</ul>
<p>This service is ideal for office floors, administrative areas or meeting rooms where several air-conditioning units are distributed in a suspended ceiling and require a well-structured power supply.</p>
<p>In the end, your air conditioners benefit from a <strong>safe power supply</strong>, correctly protected and easy to trace for maintenance. With the Myspecialist network, you work with an electrician experienced in HVAC installations in tertiary buildings.</p>
<div class="faq" style="display:none;">
<h3>Frequently Asked Questions</h3>
<ul>
<li><strong>Why group the cabling for air conditioners ?</strong> To secure the power supply, simplify maintenance and avoid overloads.</li>
<li><strong>How long does the work take ?</strong> Typically <strong>1 to 2 days</strong> for <strong>10 units</strong>, depending on ceiling access.</li>
<li><strong>Can extra units be added later ?</strong> Yes, provided power capacity and circuits are sized accordingly.</li>
</ul>
</div>