Tiling a 20m² heated floor with suitable adhesive and joints
<p>A tiled <strong>heated floor</strong> installed with suitable adhesive and grout delivers <strong>even heat distribution</strong>, reduces the risk of cracks and extends the life of the surface.</p>
<p>In this package, the tiler provides:</p>
<ul>
<li><strong>Preparation</strong> of the heated substrate over approximately <strong>20 m²</strong>: cleaning, level check and basic function test.</li>
<li><strong>Inspection</strong> of movement joints, perimeter joints and the manufacturer’s recommendations for the heating system.</li>
<li><strong>Installation</strong> of tiles using a deformable adhesive specifically designed for <strong>heated floors</strong>.</li>
<li><strong>Respect</strong> of technical joints to absorb movements due to temperature variations.</li>
<li><strong>Grouting</strong> with a mortar suitable for thermally stressed floor surfaces.</li>
<li><strong>Final cleaning</strong> and guidance on gradually bringing the system back up to temperature.</li>
</ul>
<p>This service is ideal for living rooms, kitchens, entrance halls or offices equipped with underfloor heating where comfort and a durable tiled finish are required.</p>
<p>In the end, you obtain a <strong>stable</strong>, long-lasting tiled floor that works efficiently with your heating system. With the Myspecialist network, you benefit from a tiler experienced in projects on heated floors.</p>
<div class="faq" style="display:none;">
<h3>Frequently Asked Questions</h3>
<ul>
<li><strong>Why use special adhesive for heated floors ?</strong> To absorb movement and prevent tiles from cracking or debonding.</li>
<li><strong>How long before the heating can be fully restarted ?</strong> Typically <strong>7 to 10 days</strong>, following manufacturer guidelines.</li>
<li><strong>Should the heating be switched off during the work ?</strong> Yes, it should be lowered and then gradually increased after curing.</li>
</ul>
</div>